Environmental consulting

Inspection of the Peace Lagoon in Eilat for the Government Tourism Company

The challenge

The work has included in the first stage familiarization with the site, the original plans, the actual situation, performance and supervision of tests and sampling operations at the site. Later, the data and results of onsite tests had to be analyzed, in order to understand the nature of the problem and to suggest engineering solutions to the problem.

Our part in project management

The work was carried out together with a team of experts from the RHDHV Company in the Netherlands. Our responsibility included coordination of all work in Israel, including liaison, obtaining information, translations, selecting an implementing company, oversight of tests and sampling operations conducted in the field and assistance in analyzing the information and understanding the problem. The Dutch experts analyzed the existing engineering information, defined the tests and sampling operations required, the work methodology, analyzed the results in order to better understand the problem, and presented possible engineering solutions to the problem.

Related Projects

Environmental Transparency: The PRTR Project and Its Impact on Israeli Industry

The Pollutant Release and Transfer Register (PRTR) marks a significant advance in Israel’s journey toward...

A Recycling Revolution: Hiriya Facility Leads Israel to a Greener Future

In 2020, DHV MED joined the planning process of a land mark recycling facility at...

Haifa Bay Gateway Project Assessment

Advising the Ministry of Environmental Protection regarding regulation of plants that require emission permits under...